How it works
From your plot to a priced plan, in 4 steps.
1
Site visit
An engineer visits your plot, checks the soil and the surroundings, and listens to what your family needs.
→2
Floor plan
Your floor plan is fixed with you, so the structure is designed around the rooms you actually want.
→3
Structural drawings
Footings, columns, beams and slabs designed to IS codes, with reinforcement details your contractor can build from.
→4
BOQ
Every item measured from the drawings and priced at current local rates, so you know the real budget before work begins.
These are typical times for a standard house. A project can take longer when the floor plan changes after approval, when soil tests or site details are awaited, for larger or special buildings, or while we wait for your inputs. We will tell you the expected dates at the start.